The 380kV GIS-Substation of Bishah is located about 250km southeast of Mekka (KSA). The project includes the construction of a new 380/132kV indoor Substation, including 18 C.B. 380kV GIS, 6 C.B. 380kV Hybrid GIS, 21 Bays 132kV GIS, 3 Nos. 502MVA Power Transformer, 6 Nos. 380kV Shunt Reactor and all necessary Protection, Control Communication, AMR System and SCADA Equipment.
Year:
2014/2015
Location:
Bishah / Kingdom of Saudi Arabia
Customer:
SEC - Saudi Electric Company
Scope of supply:
Engineering & Fabrication of 23 local control panels for 380kV Switchgear including 2-Stage Pole Discordance Protection, Alarm Annunciation and Metering.
Engineering & Fabrication of 6 local control panels for 380kV Hybrid GIS, preinstalled in 20ft containers for easy transportation and installation.