The project of As-Safa includes the construction of a new 380/132kV indoor Substation in Riyadh (KSA), including 24 C.B. 380kV GIS, 4 C.B. 380kV Hybrid GIS 6 Nos. 502MVA Power Transformer, 4 Nos. 380kV Shunt Reactor and all necessary Protection, Control Communication, AMR System and SCADA Equipment.
Year:
2014 - 2015
Location:
Riyadh / Kingdom of Saudi Arabia
Customer:
SEC – Saudi Electric Company
Scope of supply:
Engineering & Fabrication of 29 local control panels for 380kV Switchgear including, 4 local control panels for outdoor hybrid switchgears (container solution), Alarm Annunciation and Metering.
Engineering & Fabrication of 6 local control panels for 380kV Hybrid GIS, pre-installed in 20ft containers for easy transportation and installation.
© 2022 solutec automation ag